Skip to content

Company

d-Matrix

AI chip startup building data-center inference accelerators using in-memory computing, including its stacked-DRAM Raptor architecture.

Known aliases

  • dMatrix
  • D-Matrix
  • d-Matrix Corp.
  • d-Matrix Inc.

Current stories

buildOne report1 publisher

d-Matrix models 100 TB/s per card for Raptor, a stacked-DRAM chip due in late 2027

d-Matrix's ISCA paper models up to 100 TB/s per card for Raptor, a stacked-DRAM inference accelerator. The figures come from modeling and the first cards are expected in Nvidia MGX racks in late 2027, so they have no bearing on inference hardware bought in the next year.

Publishers:runtimewire.com

Reality

Evidence38
Adoption4
Hype gap+35
Incentives70
Confidence45
buildOne report1 publisher

d-Matrix's CTO labels Raptor's 1,000-tokens-per-second figure a simulation

d-Matrix CTO Sudeep Bhoja says Raptor's 1,000 tokens per second per user comes from a simulated 72-card system, with full racks not due until Q4 2027. Whole-system speed, power and cost per request are still unmeasured, so buyers are working from early silicon tests and simulations.

Reality

Evidence30
Adoption
Not scored
Hype gap+35
Incentives70
Confidence40
productOne report1 publisher

Qualcomm puts tokens per watt at the centre of its AI infrastructure pitch

Qualcomm's Tony Pialis told the AI Infra Summit in Santa Clara that tokens per watt is the new key metric in the AI war. The vendors in the room disagreed about which memory architecture gets them there.

Publishers:siliconangle.com

Reality

Evidence46
Adoption34
Hype gap+33
Incentives82
Confidence52
leadershipOne report1 publisher

Apple weighs building its M8 Ultra servers around Nvidia's NVLink Fusion interconnect

Apple has not confirmed the plan and the M8 Ultra is years from release. Seven other companies have already licensed the same rack interconnect from Nvidia, and their dates are the ones a buyer can use.

Publishers:implicator.ai

Reality

Evidence45
Adoption50
Hype gap+20
Incentives70
Confidence55
buildOne report1 publisher

Lambda ran 19 Blackwell nodes on the power budget provisioned for 16

The one measured number behind NVIDIA's tokens-per-megawatt pitch comes from Lambda's Blackwell cluster, where power reclaimed from static provisioning ran three extra nodes. Amazon's Annapurna Labs and d-Matrix got a line each.

Reality

Evidence33
Adoption45
Hype gap+44
Incentives90
Confidence60
scienceOne report1 publisher

AWS splits one inference workload between Trainium and a Cerebras wafer-scale engine

In IEEE Spectrum's account of the 2026 compute market, reasoning and agentic workloads have pushed serving toward memory-heavy silicon, and Amazon now runs a single inference job across two vendors' chips.

Reality

Evidence47
Adoption55
Hype gap+24
Incentives66
Confidence46
buildOne report1 publisher

Raptor's 0.37 pJ/bit is measured. The DRAM underneath it has no named fab.

d-Matrix says stacking compute on a co-designed DRAM die moves bits at roughly a sixth of HBM4's energy cost. It still has not said who fabricates the die.

Publishers:tomshardware.com

Reality

Evidence58
Adoption12
Hype gap+32
Incentives72
Confidence55